Glossary entry

German term or phrase:

Blindgleis

English translation:

(unconfirmed:) dead-end track

Added to glossary by Veronika Neuhold
Jun 16, 2008 19:06
16 yrs ago
1 viewer *
German term

Blindgleis

German to English Tech/Engineering Transport / Transportation / Shipping Schienenverkehr
Ich übersetze eine Stellwerk-Software.

"Blindgleis" erscheint in einer Tabelle als Bildelement gemeinsam mit folgenden anderen Bildelementen:

Umfahrpunkt
Selektierpunkt
Gleisabschnitt
**Blindgleis**
Streckengleis
Streckenblock
Weiche
Kreuzung
Signal
Hauptsignal
Schubsignal
Vorsignal
Notsignal
Fahrstraßenziel
Stellwerksgrenze
Station

Für "Gleis" werden hier verschiedene Übersetzungen angeboten:
http://www.woerterbuch-uebersetzung.de/gleis.html
Proposed translations (English)
3 +3 dead-end spur
3 blind track
Change log

Jun 19, 2008 17:23: Veronika Neuhold changed "Edited KOG entry" from "<a href="/profile/602756">Veronika Neuhold's</a> old entry - "Blindgleis"" to ""(unconfirmed:) dead-end track""

Discussion

jccantrell Jun 17, 2008:
They do not give 'Blindgleis' here: http://www.frankenbahn.de/woerterbuch/woerterbuchD1.htm#B
but it would sound like it is.
The picture here sure looks like it: http://www.sh1.org/eisenbahn/snzs.htm

Proposed translations

+3
14 mins
Selected

dead-end spur

Not really a railroad kinda guy, but this is what I came up with.
Note from asker:
I use "dead end track" for "Stumpfgleis". May "Stumpfgleis" and "Blindgleis" be the same?
Peer comment(s):

agree eloso (X)
1 hr
agree David Moore (X) : Or just "dead end"
12 hrs
agree hazmatgerman (X) : And here: http://www.msha.gov/FATALS/1996/FTL96M38.HTM under "physical factors".
12 hrs
Something went wrong...
4 KudoZ points awarded for this answer. Comment: "Sounds plausible, thanks."
14 mins

blind track

It is necessary that the two resistive lines of two tracks converging into a point be connected in such a way as to form a single resistive line while the terminal of the resistive line relative to the track which is to be disconnected from the shunting point (***blind track***) should be connected to a half circuit with a polarity dependent on the flow direction of the current in the line so as to block the way of any coming train.
http://www.freepatentsonline.com/4133505.html



The displacement of railway carriages on railway yards and along tracks in industrial areas, particularly along ***blind tracks***, can be carried out by means of conventional engines or shunting engines.
http://www.wipo.int/pctdb/en/wo.jsp?wo=1989011410&IA=WO19890...
Something went wrong...
Term search
  • All of ProZ.com
  • Term search
  • Jobs
  • Forums
  • Multiple search